Welcome to MEA China
Project References
Xiamen BRT Parking Lot
Back to list       Related Water Product
  • Product name:
    Xiamen BRT Parking Lot
  • Project implementation time:
    2011
  • Project location:
    Xiamen,Fujian
  • Project background:
    Xiamen Bus Rapid Transit, also known as Xiamen BRT, has the full name of Xiamen Bus Rapid Transit System. Since September 1, 2008, the BRT has been officially put into use. The system includes dedicated stations, elevated dedicated roads and lanes. In the narrow sense, Xiamen the BRT System only includes 6 BRT express lines, while in the broad sense, it has 8 BRT express lines and 1 BRT airportline. It is the first BRT system in China to adopt the viaduct mode.
Project content

Preformed drainage system of polymer concretecast iron cover

MEA®DRAIN

EN3000*400m


TEL:400-900-8996
Links
MEA China All rights reserved Copyright © 1986-2020 ICP Bei: Su ICP Bei 13019688 No.-1