With the large excavated volume for construction, formwork is necessarily erected in the cast-in-place concrete linear drainage system, resulting in complicated construction, high labor cost, and being difficult to control its overall quality.
Due to the rough surface, it has poor water passing capacity, easy to deposit wastes
It is not suitable for the discharge of chemical waste liquid or highly corrosive liquid, easy to pollute the soil in large areas
Due to the existence of aqueous materials, it is easy to damage by frost heaving in cold areas, and thus it has the disadvantages of short service life and high maintenance cost.
Due to the complicated construction process, it also has the disadvantages of long construction period, high labor cost, severely affected by weather factors.
With heavy pollution and high energy consumption during cement production, natural environment such as clean water and green mountains is destroyed.
The grating is not provided with a reliable locking system, affecting the safety of passengers and vehicles, and easy to dislocate and cause noise.