Welcome to MEA China
Project References
BeijingBenz Proving Ground
Back to list       Related Water Product
  • Product name:
    BeijingBenz Proving Ground
  • Project implementation time:
    2014
  • Project location:
    Beijing
  • Project background:
    Funded by Beijing Benz Automotive Co., Ltd., Beijing Benz Proving Ground was designed according to European standards. The project includes fast circular track and 16 kinds of special roads. Thefast track is 2.1km long, in the form of handset east-west direction. The curve section includes 3 lanes, eachbeing 3.5m wide; the radius of west curveis 57.5m, the radius of the eastcurve is 41.5m,the length of curves is about 770m, and the maximum inclination angle of curved surface is 39°. After completion, the proving ground will be mainly used to speed up the development of new technologies for Benz cars, and test the driving behavior and high-speed safety of cars.
Project content

MEA®DRAIN heavy load EN/2010/2000

MEA Grease Separator

MEA®DRAIN

EN1000

ESK-S

NS60

NS15


TEL:400-900-8996
Links
MEA China All rights reserved Copyright © 1986-2020 ICP Bei: Su ICP Bei 13019688 No.-1